How Much Concrete Do I Need for a 20×20 Slab?

Short answer: a 20×20 slab at the standard 4-inch thickness needs 4.94 cubic yards of concrete. With the usual 10% safety margin, order 5.5 yards of ready-mix. At roughly $150 per yard, budget about $815 for the concrete alone. The numbers by thickness Thickness Concrete needed (before safety margin) 4 inches (standard) 4.94 cubic yards … Read more